TM 1-1520-238-23
11-388
11.87.
CPG TO PILOT LATERAL F.S. 65.50 CONTROL BRACKET ASSEMBLY
REMOVAL/INSTALLATION continued
c. Install rod (8) on bellcrank (2). Torque nut (10)
30 to 40 INCH-POUNDS.
(1) Aline rod (8) with bellcrank (2).
(2) Install bolt (11) through washer (12), bushing
(13), bellcrank (2), and rod (8).
(3) Check fit of self-retaining bolt (11) (para 11.1).
(4) Install nut (10). Torque nut (10) to 30 INCH-
POUNDS. Use torque wrench.
(5) Increase torque to aline cotter pin hole, but do
not exceed 40 INCH-POUNDS.
(6) Install new cotter pin (9).
d. Install rod (1) on bellcrank (2). Torque nut (4) 30
to 40 INCH-POUNDS.
(1) Aline rod (1) with bellcrank (2).
(2) Install bolt (5) through washer (6), bushing
(7), bellcrank (2), and rod (1).
(3) Check fit of self-retaining bolt (5) (para 11.1).
(4) Install nut (4). Torque nut (4) to 30 INCH-
POUNDS. Use torque wrench.
(5) Increase torque to aline cotter pin hole, but do
not exceed 40 INCH-POUNDS.
(6) Install new cotter pin (3).
GO TO NEXT PAGE
M04-4317-10
11
10
12
13
2
9
8
5
6
7
2
4
3
1
M04-4317-11
