TM 1-1520-238-23
11-614
11.138.
COLLECTIVE F.S. 161.60 BELLCRANK REMOVAL/INSTALLATION continued
c. Remove push-pull rod (13) from bellcrank (7).
(1) Remove and discard cotter pin (14).
(2) Remove nut (15).
(3) Remove bolt (16), washer (17), and bushing
(18).
(4) Remove rod (13) from bellcrank (7).
d. Remove bellcrank (7) from bracket (19).
(1) Remove and discard cotter pin (20).
(2) Remove nut (21).
(3) Remove bolt (22), washer (23), and bushing
(24).
(4) Remove bellcrank (7).
11.138.4. Cleaning
a. Wipe removed and attaching parts with a
clean rag.
11.138.5. Inspection
a. Check removed and attaching parts for dam-
age (para 11.5).
b. Check removed and attaching parts for corro-
sion (para 1.49).
c. Check all installed bushing(s) and/or bear-
ing(s) for wear (para 11.5).
d. Check all removed bushing(s) and/or bear-
ing(s) for wear (para 11.4).
GO TO NEXT PAGE
M04-4362-5
13
14
15
17
16
7
18
7
24
21
19
20
22
23
M04-4362-6