TM 1-1520-238-23
11-718
11.163.
CPG TO PILOT CONTROL DIRECTIONAL F.S. 120.00 RIG CONNECTING LINK
REMOVAL/INSTALLATION continued
11.163.3. Removal
a. Remove rig connecting link (1) from bellcrank
(2).
(1) Remove and discard cotter pin (3).
(2) Remove nut (4).
(3) Remove bolt (5), washer (6), and bushing (7)
from bellcrank (2) and link (1).
b. Remove rig connecting link (1) from bellcrank
(8).
(1) Remove and discard cotter pin (9).
(2) Remove nut (10).
(3) Remove bolt (11), washer (12), bushing (13),
and bushing (14) from bellcrank (8), rod end
(15), and link (1).
(4) Remove link (1).
11.163.4. Cleaning
a. Wipe removed and attaching parts with a
clean rag.
11.163.5. Inspection
a. Check removed and attaching parts for dam-
age (para 11.5).
b. Check removed and attaching parts for corro-
sion (para 1.49).
c. Check all installed bushing(s) and/or bear-
ing(s) for wear (para 11.5).
d. Check all removed bushing(s) and/or bear-
ing(s) for wear (para 11.4).
GO TO NEXT PAGE
7
M04-5070-2
3
4
1
6
5
2
M04-5070-3
1
8
12
15
9
10
14
11
13
