TM 1-1520-238-23
Change 3
11-1175
11.277.
TAIL ROTOR PITCH LINK REMOVAL/INSTALLATION continued
b. Install pitch link (1) on pitch horn (2). Torque
nut (4) 225 to 285 INCH-POUNDS.
(1) Aline link (1) with horn (2).
(2) Install bolt (5) through washer (6), safety
washer (7), link (1), and horn (2).
(3) Check fit of self-retaining bolt (5) (para 11.1).
(4) Install nut (4). Torque nut (4) to 225 INCH-
POUNDS. Use torque wrench.
(5) Increase torque to aline cotter pin hole, but do
not exceed 285 INCH-POUNDS.
(6) Install new cotter pin (3).
(7) Apply primer to bolt head (5) and nut (4). Use
epoxy primer coating kit (item 78, App F).
c. Inspect (QA).
d. Install tail rotor electrical leads (para 11.276).
END OF TASK
M04-1764-5
1
5
6
7
4
2
3
1
2