TM 1-1520-238-23Change 311-117511.277.TAIL ROTOR PITCH LINK REMOVAL/INSTALLATION – continuedb. Install pitch link (1) on pitch horn (2). Torquenut (4) 225 to 285 INCH-POUNDS.(1) Aline link (1) with horn (2).(2) Install bolt (5) through washer (6), safetywasher (7), link (1), and horn (2).(3) Check fit of self-retaining bolt (5) (para 11.1).(4) Install nut (4). Torque nut (4) to 225 INCH-POUNDS. Use torque wrench.(5) Increase torque to aline cotter pin hole, but donot exceed 285 INCH-POUNDS.(6) Install new cotter pin (3).(7) Apply primer to bolt head (5) and nut (4). Useepoxy primer coating kit (item 78, App F).c. Inspect (QA).d. Install tail rotor electrical leads (para 11.276).END OF TASKM04-1764-5156742312
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business