TM 1-1520-238-23
11-1205
11.284.
RIGGING COLLECTIVE UPPER FLIGHT CONTROLS continued
p. Adjust BASIC DIM pointer (20) to aline with
center point of alinement tool (21).
(1) Install large end of alinement tool (21) in head
of mixer support bolt (22) and hold.
(2) Install rigging fixture (23) next to alinement
tool (21).
(3) Loosen thumbscrew (24) and aline BASIC
DIM pointer (20) with center point of aline-
ment tool (21).
(4) Tighten thumbscrew (24).
(5) Remove alinement tool (21) and rigging fix-
ture (23).
q. Remove -5 rig pin (16) from lateral F.S. 165
bellcrank (14).
CAUTION
To prevent damage, be sure rigging fix-
ture is clear of mixer assembly when
moving flight controls.
r. Check that BASIC DIM pointer (20) alines with
center point on alinement tool (25).
(1) Slowly move pilot cyclic stick (11) full left until
it contacts stops.
(2) Install alinement tool (25) in forward bolt head
(26) of aft longitudinal bellcrank (27).
(3) Install rigging fixture (23) next to alinement
tool (25).
(4) Move pilot cyclic stick (11) to aline level
swashplate rig pin holes (15) in lateral F.S.
165 bellcrank (14).
(5) Install -5 rig pin (16) in F.S. 165 bellcrank (14)
at level swashplate position (15).
GO TO NEXT PAGE
M04-3015-7
24
23
20
22
21
M04-3015-15
14
16
11
15
M04-3015-8
27
20
26
25
23
