TM 1-1520-238-23
Change 2
11-1201
11.283.
RIGGING PILOT AND CPG COLLECTIVE STICK STOP BOLTS continued
(3) If difference between measurements C and E
is not 3.50 to 3.56 INCHES, rig controls be-
tween pilot collective stick and collective ser-
vocylinder (para 11.282).
z. Adjust CPG collective stick down limit stop
bolt (20) for a 0.020 INCH gap between head of
bolt (20) and stick (2).
(1) With pilot stick held in the full down position,
place 0.020 INCH thickness gage (25)
against CPG stick (2).
(2) Rotate down limit stop bolt (20) counterclock-
wise until it contacts thickness gage (25).
(3) Hold bolt (20). Tighten nut (22).
(4) Lockwire bolt (20) to nut (22) and housing
(23). Use wire (item 224, App F).
aa. Inspect (QA).
ab. Perform collective flight control rigging main-
tenance operational check (TM 1-1520-238-T).
ac. Disconnect maintenance headset (para 1.134).
ad. Remove pilot collective warning flag (9).
ae. Remove external hydraulic power from air-
craft (para 1.72).
af. Install pilot and CPG collective stick covers
(para 11.44).
ag. Install access panels L200 and R200 (para
2.2).
END OF TASK
M04-3014-9
2
25
22
20
23
