ENCU COOLING TURBINE ASSEMBLY REMOVAL/INSTALLATION - continued
b. Remove hose (7) from turbine (2).
(1) Loosen two clamps (8) and (9) from hose (7).
(2) Slide hose (7) and clamps (8) and (9) from
turbine (2) on duct (10).
(3) Remove and discard packing (11).
c. Remove hose (12) from turbine (2) and water
extractor assembly (13).
(1) Loosen two clamps (14) and (15) from hose
(12).
(2) Remove hose (12) and clamps (14) and (15).
d. Remove turbine (2) from ENCU (16).
(1) Remove four bolts (17) and washers (18).
(2) Remove turbine (2).
13.9.4. Cleaning
a. Wipe removed and attaching parts with a
clean rag.
13.9.5. Inspection
a. Check ducts for chafing, cracks, dents, nicks,
or scratches (para 13.1).
b. Check removed and attaching parts for corro-
sion (para 1.49).
c. Check turbine for loose, missing or damaged
hardware (para 13.1).
13.9.6. Installation
a. Install turbine (2) on ENCU (16). Torque four
bolts (17) to 80 INCH-POUNDS.
(1) Aline turbine (2) with ENCU (16).
(2) Install four bolts (17) and washers (18).
(3) Torque four bolts (17) to 80 INCH-POUNDS.
Use torque wrench.