TM 1-1520-238-23
13-44
13.14.
ENCU SUPPORT REMOVAL/INSTALLATION - continued
13.14.3. Removal
a. Remove clamp (1) from ENCU support (2).
(1) Remove two screws (3) and washers (4).
(2) Remove clamp (1).
b. Remove support (2) from deck (5).
(1) Remove three screws (6) and washers (7).
(2) Remove sealing compound from four bolts
(8) (para 1.47).
(3) Remove six bolts (8) and washers (9) from
support (2).
(4) Remove two bolts (8) and washers (9) from
jumper wires (10).
(5) Remove support (2).
13.14.4. Cleaning
a. Clean removed and attaching parts (para
1.47).
13.14.5. Inspection
a. Check support nutplates for loose rivets and
stripped or damaged threads (para 13.1).
b. Check support and aft deck mounting area for
hole elongation, cracks, and stripped or dam-
aged threads (para 13.1).
c. Check removed and attaching parts for corro-
sion (para 1.49).
GO TO NEXT PAGE
1
3
4
M04-2151-3
2
M04-2151-2
9
8
2
7
6
9
8
10
5