TM 1-1520-238-23
13-45
13.14.
ENCU SUPPORT REMOVAL/INSTALLATION - continued
13.14.6. Installation
a. Install support (2) on deck (5). Torque eight
bolts (8) to 80 INCH-POUNDS.
(1) Aline support (2) on deck (5).
(2) Install six bolts (8) and washers (9) on sup-
port (2).
(3) Install two bolts (8) through washers (9) and
jumper wires (10).
(4) Torque eight bolts (8) to 80 INCH-POUNDS.
Use torque wrench.
(5) Install three screws (6) and washers (7).
b. Perform electrical bond check on support (2)
(TM 55-1500-323-24).
(1) Bond shall be 1.0 OHM or less. Use
multimeter.
c. Apply sealing compound around edge of sup-
port (2), two outboard bolts (8), and on two
bolts (8) with jumper wires (10). Use sealing
compound (item 175, App F).
d. Install clamp (1) on support (2).
(1) Install two screws (3) and washers (4).
e. Inspect (QA).
f. Install F.S. 275 directional bellcrank
(para 11.254).
g. Install ENCU (para 13.3).
h. Secure access doors T250L, T250R, T290L,
T290R, and L325 (para 2.2).
END OF TASK
M04-2151-4
2
8
9
6
7
5
8
9
10
1
3
4
M04-2151-5
2
