TM 1-1520-238-PM
14
CHECKLIST DISPOSITION.
The completion of each phased maintenance inspection shall be recorded on DA Form 2408-13 and 2408-15 as prescribed by DA PAM
738-751. The signed checklist, together with all continuation sheets, shall be attached to DA Form 2408-13 and filed for the six months period as required by DA PAM
738-751. At the end of the six months period, records will be destroyed per disposition instruction for DA Form 2408-13-1/2408-13-1-E in paragraph 2-9.D.(2) of DA
Pamphlet 738-751.
INSPECTION AREAS.
Figure 6 reflects the inspection areas of the AH-64A helicopter. Those areas are titled as shown. Figure 7 shows the location of access doors
and panels which require removal at various phased maintenance inspections.
REPORTING ERRORS AND RECOMMENDING IMPROVEMENTS.
You can help improve this manual. If you find any mistakes or if you know of a way to improve
the procedures, please let us know. Mail your letter, DA Form 2028 (Recommended Changes to Publications and Blank Forms), or DA Form 2028-2 located in the back
of this manual direct to: Commander, U.S. Army Aviation and Missile Command, ATTN: AMSAMMMCMA-NP, Redstone Arsenal, AL, 358985230. A reply will
be furnished to you.