TM 1-1520-238-PM
285
C1
PHASE NO.
Date
Aircraft Serial No.
Area Name and No.
AFT EQUIPMENT BAY 11
Inspect
Phase
Nos.
Initial
Action Taken
Faults and/or Remarks
Status
Inspection Requirements
ALL
33.
Clean ENCU temperature control valve.
Access L325, T250L, T250R, T290L, T290R
2,4
34.
ENCU DUCTING FOR CRACKS, CHAFED,
LOOSE, OR TORN INSULATION, AND
C
STRIPPED OR MISSING NUT PLATES.
REMOVE ENCU FILTER AND INSPECT
FOR DAMAGE AND CLEANLINESS.
Access L325, T250L, T290L, T250R, T290R
ALL
35.
ENCU outlet duct for chafing against fire
extinguishing tube(s)/line(s).
Access L325,T250L, T290L, T250R, T290R
2,4
36.
ENCU exhaust fairing for cracks,
corrosion, and loose or working rivets.
C
Access L325, T250L, T290L, T250R,T290R
ALL
37.
Flight control linkage for bent, cracked,
or corroded push-pull rods. Rod end
C
bearings worn or seized. Brackets
cracked or broken. Bellcranks for
cracks, corrosion, worn, or seized
bearings, and evidence of interference.
Access L325, T250L, T290L,T250R, T290R
FOD REMINDER
Check work area for tools and parts after completion of maintenance and inspection.