TM 1-1520-238-T-4
Change 2
449
412.
POWER PLANTS MAINTENANCE OPERATIONAL CHECK (ENGINE 1)
412
Tools:
Nomenclature
Part Number
Tool Kit, Aircraft
SC518099CLA01
Mechanics
Personnel Required:
67R
Attack Helicopter Repairer
One person to assist
152FG
Pilot
References:
TM 1-1520-238-T-5
TM 1-1520-238-T-6
TM 1-1520-238-T-7
TM 1-1520-238-T-8
TM 1-1520-238-23
TM 1-1520-238-CL
TM 55-2840-248-23
Equipment Conditions:
Ref
Condition
TM 1-1520-238-23
Power Plants
inspection performed
Engine 1 power
available spindle
rigging procedure
completed
No. 1 and No. 2 Engine
load demand spindle
(LDS) rigging check
completed
TM 1-1520-238-T-7
FUEL SYSTEM
VISUAL CHECK
completed
TM 1-1520-238-T-8
ENVIRONMENTAL
CONTROL
SYSTEM
POWER UP
completed
Paragraph 117
Maintenance headset
connected
Paragraph 410
POWER PLANTS
POWER UP
completed
NOTE
Refer to pilot station (fig. 419) and CPG station (fig. 420) for cockpit
configuration and equipment.
If referenced out of one paragraph or volume and into another for
additional troubleshooting, upon completion of the task, return to the
maintenance operational check for the original paragraph or volume.
If problem involves excessive torsional vibration and NR droop during
flight maneuvers (engine 1 Np lags engine 2 Np during recovery
maneuvers), go to paragraph 457.
The vapor vent procedure is to be performed anytime a connection is
broken on any of the fuel delivery components to insure purging of air in
lines. If vapor procedure is not required, go to step h.