TM 1-1520-238-23
2-489
2.134.
NO. 2 ENGINE NACELLE REMOVAL/INSTALLATION
2.134.1. Description
This task covers:
Removal. Cleaning. Inspection. Installation.
2.134.2. Initial Setup
Tools:
Aircraft mechanics tool kit (item 376, App H)
Light duty laboratory apron (item 27, App H)
Chemical protective gloves (item 154, App H)
Spreader bar kit (item 195, App H)
Adjustable air filtering respirator (item 262, App H)
Rod and link adjusting tool (item 365, App H)
10 - 50 inch-pound 1/4-inch drive click type torque
wrench (item 434, App H)
0 - 300 inch-pound 3/8-inch drive click type torque
wrench (item 439, App H)
Materials/Parts:
Brush (item 34, App F)
Sealing compound (item 174, App F)
Wire (item 226, App F)
Personnel Required:
67R
Attack Helicopter Repairer
Two persons to assist
67R3F
Attack Helicopter Repairer/Technical
Inspector
Equipment Conditions:
Ref
Condition
1.57
Helicopter safed
7.3
Hydraulic system vented
2.2
Access panels L200, R200, L230, and R230
removed
2.125
Access doors T250L and T250R removed
2.126
Upper fuselage doors T290L and T290R re-
moved
4.120
No. 2 engine outboard secondary nozzle re-
moved
4.121
No. 2 engine inboard secondary nozzle re-
moved
4.122
No. 2 engine center secondary nozzle re-
moved
4.123
Secondary nozzle structural support re-
moved
2.135
Engine nacelle fairing removed
4.173
No. 2 engine power available spindle aft
cable removed
4.178
No. 2 engine load demand spindle aft cable
removed
4.8
No. 2 engine removed
4.60
No. 2 engine louver removed
12.44
No. 2 engine fire extinguisher fitting re-
moved
9.148
Stabilator air speed transducer removed
15.2
APU removed
15.38
APU drain hoses removed
15.37
APU plenum fuel drain hose removed
10.100
No. 2 engine crossfeed/shutoff valve re-
moved
4.95
Right nacelle radiation shields removed
7.145
No. 2 engine air start line removed
2.137
Work platform door removed
GO TO NEXT PAGE