TM 1-1520-238-23
Change 3
2-507
2.134.
NO. 2 ENGINE NACELLE REMOVAL/INSTALLATION continued
w. Lockwire nut (95) to key washer (97). Use wire
(item 226, App F).
x. Seal rod (89). Use sealing compound (item 174,
App F) and brush (item 34, App F).
y. Install No. 2 engine fire extinguisher fitting
(para 12.44).
z. Install No. 2 engine louvers (para 4.61).
aa. Install No. 2 engine crossfeed/shutoff valve
(para 10.100).
ab. Install stabilator air speed transducer (para
9.148).
ac. Install right nacelle radiation shields (para
4.95).
ad. Install No. 2 engine (para 4.52).
ae. Install No. 2 engine power available spindle
aft cable (para 4.174).
af. Install No. 2 engine load demand spindle aft
cable (para 4.179).
ag. Install No. 2 engine air start line (para 7.145).
ah. Install engine nacelle fairing (para 2.135).
ai. Install APU (para 15.3).
aj. Install APU drain hoses (para 15.38).
ak. Install APU plenum drain hose (para 15.37).
GO TO NEXT PAGE
0.50 IN
0.50 IN
APPLY
SEALANT
96
97
89
M04-4112-45
