Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
NONTRANSPARENT BARRIER ARMOR PASS-THRU TRAY REMOVAL/INSTALLATION
TRANSPARENT CREW PROTECTION ARMOR BARRIER REPLACEMENT
TM-1-1520-238-23-2 Helicopter Attack AH-64A Apache (NSN 1520-01-106-9519) (EIC: RHA) Manual
Page Navigation
744
745
746
747
748
749
750
751
752
753
754
TM 1-1520-238-23
2-647
2.179.
NONTRANSPARENT BARRIER ARMOR PASS-THRU TRAY REMOVAL/INSTALLATION – continued
2.179.3.
Removal
a.
Enter pilot station
(para 1.56)
. Observe all
safety precautions.
b.
Remove pass–thru tray (1) from upper non-
transparent barrier assembly crew protection
armor (2).
(1) Remove three screws (3) and finishing wash-
ers (4) from tray (1).
(2) Remove tray (1) from armor (2).
2.179.4.
Cleaning
a.
Wipe removed and attaching surface with a
clean rag.
2.179.5.
Inspection
a.
Check attaching surface for excessive wear
(para 2.12)
.
2.179.6.
Installation
a.
Install tray (1) on armor (2).
(1) Aline tray (1) with five attachment points on
armor (2).
(2) Install three screws (3) and washers (4).
END OF TASK
2
3
4
1
M04-2143-3
2
3
4
1
M04-2143-4
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business