TM 1-1520-238-23
Change 4
4-117
4.37.
ENGINE BUILDUP NO. 1 AND NO. 2 ENGINE BASEPLATE AND SPINDLE GEARBOXES
INSTALLATION
4.37.1. Description
This task covers:
Installation.
4.37.2. Initial Setup
Equipment Conditions:
Ref
Condition
4.30
Engine buildup No. 1 and No. 2 engine
NOTE
This task is typical for No. 1 or No. 2 engine baseplate gearbox.
M04-1354-1A
GO TO NEXT PAGE