TM 1-1520-238-23
4-403
4.127.
NO. 1 AND NO. 2 ENGINE SECONDARY NOZZLE UPPER AND INTERMEDIATE SUPPORT STRUT
BUSHING REPLACEMENT (AVIM)
4.127.1. Description
This task covers:
Removal. Cleaning. Inspection. Installation.
4.127.2. Initial Setup
Tools:
Aircraft mechanics tool kit (item 376, App H)
2-ton hydraulic hand operated arbor press (item 235,
App H)
Personnel Required:
67R
Attack Helicopter Repairer
67R3F
Attack Helicopter Repairer/Technical
Inspector
NOTE
This task is typical for all upper nozzle
strut bushings.
4.127.3. Removal
a. Place strut (1) in arbor press (2).
b. Position bushing (3), flange down, under
press ram (4).
GO TO NEXT PAGE
2
M04-2616-2
1
3
4