TM 1-1520-238-23
Change 4
4-457
4.143.
NO. 1 ENGINE LOAD DEMAND SPINDLE GEARBOX REMOVAL/INSTALLATION continued
4.143.6. Installation
a. Install gearbox (2) on baseplate (7). Torque
bolts (8), (11), and (12) to 60 INCH-POUNDS.
(1) Aline pins (15) and (16) with holes (17) and
(18).
(2) Aline hub wide tooth space (19) with spline
wide tooth (20). Rotate slot (21) to aline.
(3) Slide hub (22) on spline (23).
(4) Install long bolt (12), bolt (11), two counter-
sunk washers (14), and two flat washers (13).
(5) Install bolt (8), countersunk washer (10), and
two flat washers (9).
(6) Torque bolts (8), (11), and (12) to 60 INCH-
POUNDS. Use torque wrench and torque
wrench adapter.
b. Install cable (1) on gearbox (2). Torque coupling
nut (4) to 70 INCH-POUNDS.
(1) Install cable fitting (5) on gearbox fitting (6).
(2) Install coupling nut (4) on gearbox (2).
(3) Hold cable flats (3). Torque coupling nut (4) to
70 INCH-POUNDS. Use torque wrench and
torque wrench adapter.
GO TO NEXT PAGE
M04-1179-8A
16
19
22
15
17
23
21
2
7
11
14
13
12
8
10
9
20
18
14
13
M04-1179-9
6
4
1
2
5
3