TM 1-1520-238-23
4-458
4.143.
NO. 1 ENGINE LOAD DEMAND SPINDLE GEARBOX REMOVAL/INSTALLATION continued
c. Inspect (QA).
d. Perform No. 1 engine load demand spindle rigging check (para 4.184).
e. Perform power plants maintenance operational check (engine 1) (TM 1-1520-238-T).
f. Install engine shroud (para 4.51).
g. Secure access door LN1 (para 2.2).
END OF TASK