NO. 1 ENGINE POWER AVAILABLE SPINDLE CENTER CABLE INSTALLATION continued
m. Install cable (2) to aft cable (24). Torque cou-
pling nut (25) to 70 INCH-POUNDS.
(1) Attach cable (2) connector (26) to cable (24)
connector (27).
(2) Install coupling nut (25) on cable (24).
(3) Hold cable (2) at flats (28). Torque nut (25) to
70 INCH-POUNDS. Use torque wrench.
n. Install clamps (29) and (30) on bracket (31).
(1) Position clamp (29) on cable (2).
(2) Install screw (32) through bracket (31),
clamps (30) and (29), washer (33), and nut
(34).
o. Install bracket (35) on deck (4).
(1) Install cables (2) and (36) in clips (37).
(2) Install two screws (38) through washers (39)
and bracket (35) on deck (4).