NO. 1 ENGINE POWER AVAILABLE SPINDLE CENTER CABLE INSTALLATION continued
h. Set pilot power levers (19) to IDLE.
i. Adjust cable (2) travel to 2.95 3.45 INCHES.
(1) Install rig pin (20) through bracket (21) and
bellcranks (22) and (14).
(2) Adjust nuts (7) and (11) to get correct travel.
(3) Hand tighten nuts (7) and (11).
j. Torque nuts (7) and (11) to 90 INCH-POUNDS.
(1) Hold cable (2) at flats (23). Torque nuts (7)
and (11) to 90 INCH-POUNDS. Use torque
wrench.
k. Inspect (QA).
(1) Verify cable (2) travel is 2.95 3.45 INCHES.
l. Remove rig pin (20) from bracket (21) and bell-
cranks (14) and (22).