TM 1-1520-238-23
4-474
4.146.
NO. 1 ENGINE POWER AVAILABLE SPINDLE CENTER CABLE INSTALLATION continued
t. Install clamp (63) on clamp (64).
(1) Position clamp (63) on cable (2).
(2) Install screw (65) through washer (66),
clamps (63) and (64), washer (67), and nut
(68).
u. Inspect (QA).
v. Perform No. 1 engine power available spindle
system rigging check (para 4.186).
w. Install transformer-rectifier No. 1 (para 9.30).
x. Install pilot FUEL control panel (para 10.54).
y. Install pilot EXT LT/INTR LT panel (para 9.62).
z. Install pilot left console panels PL1, PL3, and
access panels L160 and L200 (para 2.2).
aa. Perform power plants maintenance operation-
al check (engine 1) (TM 1-1520-238-T).
END OF TASK
M04-1184-21
63
67
64
65
66
68
2