TM 1-1520-238-23
Change 1
4-623
4.177.
NO. 1 ENGINE LOAD DEMAND SPINDLE AFT CABLE INSTALLATION continued
e. Install forward cable (11) on aft cable (2).
Torque nuts (9) and (10) to 90 INCH-POUNDS.
(1) Adjust nuts (9) and (10) to aline cable (2) with
cable (11).
(2) Install cable fitting (12) on cable fitting (13).
(3) Install coupling nut (14) on cable (2).
(4) Hold cable (2) at flats (15). Torque nuts (9)
and (10) to 90 INCH-POUNDS. Use torque
wrench and crowfoot.
(5) Hold cable (11) at flats (16). Torque nut (14) to
70 INCH-POUNDS. Use torque wrench and
crowfoot.
f. Install cable (2) on gearbox (17). Torque cou-
pling nut (20) to 70 INCH-POUNDS.
(1) Install cable fitting (18) on gearbox fitting (19).
(2) Install coupling nut (20) on gearbox (17).
(3) Hold cable (2) at flats (21). Torque nut (20) to
70 INCH-POUNDS. Use torque wrench and
crowfoot.
g. Install support (22) on firewall (23).
(1) Install four screws (24) through support (22)
and firewall (23).
(2) Install four washers (25) and nuts (26) on
screws (24).
GO TO NEXT PAGE
915
10
2
13
12
11
14
M04-1204-8A
16
19
M04-1204-9A
17
18
21
20
2
24
25
23
M04-1204-10
26
22
23