TM 1-1520-238-23
4-626
4.178.
NO. 2 ENGINE LOAD DEMAND SPINDLE AFT CABLE REMOVAL continued
d. Remove aft cable (3) from gearbox (4).
(1) Hold cable flats (5). Remove coupling nut (6).
(2) Remove cable fitting (7) from gearbox fitting
(8).
e. Remove clamp (9) from bracket (13).
(1) Hold screw (10). Remove nut (11) and wash-
er (12).
(2) Remove screw (10) from clamp (9) and
bracket (13).
(3) Remove clamp (9) from cable (3).
f. Loosen top nine screws (14) on angle (15).
g. Remove retainer seal (16) and firewall plate
(17) from louver enclosure (18).
(1) Remove two screws (19) and washers (20).
(2) Remove seal (16) and firewall plate (17).
GO TO NEXT PAGE
3
5
6
7
M04-1205-2
8
4
M04-1205-3
10
13
9
11
12
3
15
14
M04-1205-10
M04-1205-4
16
20
19
17
18