TM 1-1520-238-23
4-624
Change 1
4.177.
NO. 1 ENGINE LOAD DEMAND SPINDLE AFT CABLE INSTALLATION continued
h. Install clamps (27) and (28) on support (22).
(1) Install clamp (27) on cable (2).
(2) Install two screws (30) through clamps (27)
and (28) and support (22).
(3) Hold two screws (30). Install two washers
(31) and nuts (32).
i. Inspect (QA).
j. Perform No. 1 and No. 2 engine load demand
spindle rigging check (para 4.184).
k. Install panel L200 (para 2.2).
END OF TASK
28
27
22
31
32
2
30
M04-1204-11