TM 1-1520-238-23
7-39
7.11.
PRIMARY HYDRAULIC MANIFOLD REMOVAL/INSTALLATION continued
7.11.3. Removal
a. Enter pilot station (para 1.56). Observe all
safety precautions.
b. On pilot forward circuit breaker panel, open
EMER HYD and LT CAUT circuit breakers.
c. Enter CPG station (para 1.56). Observe all
safety precautions.
d. On CPG circuit breaker panel, open EMER
BATT CAUT circuit breaker.
e. Remove tube (1) from air check valve (2).
(1) Place rags around primary hydraulic manifold
(3) to catch hydraulic fluid spills.
(2) Hold check valve (2). Remove nut (4).
(3) Remove and discard filter (5).
f. Remove tube (6) from adapter (7).
(1) Remove nut (8).
g. Remove tube (9) from adapter (10).
(1) Remove nut (11).
h. Remove tube (12) from adapter (13).
(1) Remove nut (14).
GO TO NEXT PAGE
M04-750-2
1
4
5
3
2
6
8
7
10
11
9
M04-750-3
13
14
M04-750-4
12