TM 1-1520-238-23
Change 3 9-77
9.21.
DC BUS TIE CONTACTOR REMOVAL/INSTALLATION continued
b. Detach connector (A402)P14 (1) from recep-
tacle (A4)J1 (2).
c. Remove two terminal shields (3).
(1) Remove two screws (4), washers (5), and
shields (3).
d. Remove two bus conductors (6).
(1) Remove two nuts (7) and washers (8).
(2) Identify and detach wires (9) from studs (10).
(3) Remove conductors (6) from studs (10).
e. Detach wires (11) from studs (12).
(1) Remove two nuts (13) and washers (14) from
studs (12).
(2) Identify and detach wires (11) from studs
(12).
f. Remove DC bus tie contactor (15).
(1) Remove four screws (16) and washers (17).
(2) Remove contactor (15).
9.21.4. Cleaning
a. Clean removed and attaching parts (para
1.47).
9.21.5. Inspection
a. Check removed and attaching parts for dam-
age (para 9.1).
b. Check removed and attaching parts for corro-
sion (para 1.49).
GO TO NEXT PAGE
1
2
4
5
3
M04-3080-7A
TYPICAL BOTH SIDES (LH SIDE SHOWN)
11
12
M04-3080-8A
9
87
6
13
14
10
M04-3080-9A
16
17
15
