TM 1-1520-238-23
9-160
9.47.
CPG CIRCUIT BREAKER PANEL NO. 2 REMOVAL/INSTALLATION
9.47.1. Description
This task covers:
Removal. Cleaning. Inspection. Installation.
9.47.2. Initial Setup
Tools:
Electrical tool kit (item 378, App H)
Ohmmeter (item 218, App H)
Personnel Required:
68X
Armament/Electrical System Repairer
68X3F
Armament/Electrical System Repairer/
Technical Inspector
References:
TM 1-1520-238-T
TM 55-1500-323-24
Equipment Conditions:
Ref
Condition
1.57
Helicopter safed
9.43
CPG circuit breaker panel No. 1 removed
9.47.3. Removal
a. Enter pilot station (para 1.56). Observe all
safety precautions.
b. On pilot aft center circuit breaker panel, open
six POWER circuit breaker.
c. Enter CPG station (para 1.56). Observe all
safety precautions.
d. Remove CPG circuit breaker panel No. 2 (1).
(1) Remove six screws (2), washers (3), and
grommets (4) from panel (1).
(2) Remove panel (1).
GO TO NEXT PAGE
M04-1297-1
CPG STATION
M04-1297-2
4
3
2
1