CPG CIRCUIT BREAKER PANEL NO. 2 REMOVAL/INSTALLATION continued
9.47.6. Installation
a. Install jumper (11) on panel (1).
(1) Install screw (12) through panel (1).
(2) Install washer (17) and nut (16) on screw
(12).
(3) Install terminal lug (15), washer (14), and nut
(13) on screw (12).
b. Attach connectors (A97)P1 (7), P761 (6), and
P763 (5) to panel (1).
(1) Attach connector (A97)P1 (7) to receptacle
J764 (10).
(2) Attach connector P761 (6) to receptacle
(A97)J1 (9).
(3) Attach connector P763 (5) to receptacle
(A97)J2 (8).
c. Inspect (QA).
d. Install panel (1).
(1) Install six screws (2) through washers (3) and
grommets (4) in panel (1).
e. Perform
electrical
bond
check
(TM 55-1500-323-24).
(1) Bond shall be 0.0025 OHM or less. Use
ohmmeter.
f. Inspect (QA).
g. Install CPG circuit breaker panel No. 1 (para
9.43).
h. Refer to circuit breaker reference list to per-
form appropriate maintenance operational
check (TM 1-1520-238-T).
END OF TASK