TM 1-1520-238-23
9-164
9.48.
CPG CIRCUIT BREAKER PANEL NO. 2 LIGHT INDICATING PANEL
REMOVAL/INSTALLATION continued
9.48.4. Cleaning
a. Wipe removed and attaching parts with a clean
rag.
9.48.5. Inspection
a. Check removed and attaching parts for dam-
age (para 9.1).
b. Check removed and attaching parts for corro-
sion (para 1.49).
9.48.6. Installation
a. Install panel (1) on panel (2).
(1) Position panel (1) on panel (2).
(2) Install four screws (3).
b. Perform circuit breaker edge-lights panel
maintenance
operational
check
(TM 1-1520-238-T).
END OF TASK
3
1
M04-1319-3
2