TM 1-1520-238-23
9-203
9.57.
AFT AVIONICS BAY DISTRIBUTION BOX DISASSEMBLY/ASSEMBLY continued
e. Install receptacle (A323)J7 (25) on box (4).
(1) Position receptacle (25) on box (4).
(2) Install four screws (28) through washers (29),
box (4), and receptacle (25).
(3) Hold four screws (28). Install nuts (27).
(4) Pin identified wires (26) in receptacle (25)
(TM 55-1500-323-24).
f. Install terminal track (21) on box (4).
(1) Position track (21) on box (4).
(2) Install two screws (23) and washers (24).
g. Install terminal junction modules (20) on ter-
minal track (21).
(1) Position and press modules (20) until seated
(para 9.139).
(2) Pin identified wires (22) in modules (20)
(TM 55-1500-323-24).
h. Install terminal track (16) on box (4).
(1) Position track (16) on box (4).
(2) Install two screws (18) and washers (19).
GO TO NEXT PAGE
M04-4202-20
4
28
25
27
26
29
M04-4202-21
4
23
24
21
20
21
22
M04-4202-22
M04-4202-23
4
16
18
19