TM 1-1520-238-23
11-695
11.157. PILOT DIRECTIONAL SHEAR PIN ACTIVATED DECOUPLER (SPAD) SHEAR RIVET
REPLACEMENT (AVIM) continued
11.157.4. Cleaning
a. Clean removed and attaching parts (para
1.47).
11.157.5. Inspection
a. Check removed and attaching parts for dam-
age (para 11.5).
b. Check removed and attaching parts for corro-
sion (para 1.49).
c. Check all installed bushing(s) and/or bear-
ing(s) for wear (para 11.5).
d. Check all removed bushing(s) and/or bear-
ing(s) for wear (para 11.4).
11.157.6. Installation
a. Install lever (1) on SPAD (2).
(1) Aline lever (1) with SPAD (2).
(2) Install bushing (8) in lever (1).
(3) Install bolt (6) through washer (7), lever (1),
and SPAD (2).
(4) Check fit of self-retaining bolt (6) (para 11.1).
(5) Install nut (4) and washer (5).
(6) Install new cotter pin (3).
b. Install shear rivet (11) in lever (1).
(1) Aline arm (1) with SPAD (2).
(2) Install rivet (11) (TM 1-1500-204-23).
c. Inspect (QA).
END OF TASK
M04-1812-3
8
7
6
3
4
2
5
1
11