TM 1-1520-238-23
11-1053
11.250.
DIRECTIONAL F.S. 216.25 BELLCRANK INSTALLATION continued
d. Install counterbalance weight (21) on bell-
crank (1).
(1) Position weight (21) in bellcrank (1).
(2) Install bushing (23) in bellcrank (1).
(3) Install bolt (24) through bellcrank (1), weight
(21), and bushing (23).
(4) Install washer (25) and nut (22).
e. Inspect (QA).
f. Perform directional flight control rigging
maintenance
operational
check
(TM 1-1520-238-T).
g. Install access panel L200 (para 2.2).
END OF TASK
M04-1789-7
21
22
25
23
24
1