TM 1-1520-238-23
11-1123
11.266.
TAIL ROTOR CONNECTING LINK REMOVAL/INSTALLATION continued
11.266.3. Removal
a. Remove sealing compound from nut (1) and
bolt (2).
b. Remove tail rotor connecting link (3) from
bellcrank (4).
(1) Remove and discard cotter pin (5).
(2) Remove nut (1).
(3) Remove bolt (2) and washer (6).
(4) Remove connecting link (3) from bellcrank
(4).
c. Remove sealing compound from nut (7) and
bolt (8).
d. Remove tail rotor connecting link (3) from ser-
vocylinder (9).
(1) Remove and discard cotter pin (10).
(2) Remove nut (7).
(3) Remove bolt (8).
(4) Remove connecting link (3).
11.266.4. Cleaning
a. Clean removed and attaching parts (para
1.47).
11.266.5. Inspection
a. Check removed and attaching parts for dam-
age (para 11.232).
b. Check removed and attaching parts for corro-
sion (para 1.49).
c. Check all installed bushing(s) and/or bear-
ing(s) for wear (para 11.232).
d. Check all removed bushing(s) and/or bear-
ing(s) for wear (para 11.4).
GO TO NEXT PAGE
M04-1784-2
5
1
4
6
2
8
9
10
7
3
