TM 1-1520-238-23
11-1145
11.271.
DIRECTIONAL F.S. 534 PUSH-PULL ROD REMOVAL/INSTALLATION continued
11.271.3. Removal
a. Remove sealing compound from bolt (1) and
nut (2).
b. Remove push-pull rod (3) from upper bell-
crank (4).
(1) Remove and discard cotter pin (5).
(2) Remove nut (2).
(3) Remove bolt (1) and washer (6).
c. Remove sealing compound from bolt (7) and
nut (8).
d. Remove rod (3) from lower bellcrank (9).
(1) Remove and discard cotter pin (10).
(2) Remove nut (8).
(3) Remove bolt (7).
(4) Remove rod (3).
11.271.4. Cleaning
a. Clean removed and attaching parts (para
1.47).
11.271.5. Inspection
a. Check removed and attaching parts for dam-
age (para 11.232).
b. Check removed and attaching parts for corro-
sion (para 1.49).
c. Check all installed bushing(s) and/or bear-
ing(s) for wear (para 11.232).
d. Check all removed bushing(s) and/or bear-
ing(s) for wear (para 11.4).
GO TO NEXT PAGE
M04-1762-3
5
2
4
6
1
3
M04-1762-4
10
8
3
7
9