TM 1-1520-238-23
12-59
12.19.
APU FIRE PANEL SWITCH REPLACEMENT (AVIM)
12.19.1. Description
This task covers:
Removal. Cleaning. Inspection. Installation.
12.19.2. Initial Setup
Tools:
Electrical tool kit (item 378, App H)
Light duty laboratory apron (item 27, App H)
Chemical protective gloves (item 154, App H)
Adjustable air filtering respirator (item 262, App H)
Soldering gun (item 334, App H)
Materials/Parts:
Solder (item 189, App F)
Personnel Required:
68X
Armament/Electrical System Repairer
68X3F
Armament/Electrical System Repairer/
Technical Inspector
References:
TM 55-1500-323-24
Equipment Conditions:
Ref
Condition
12.18
APU fire panel light indicating panel re-
moved
NOTE
This task is typical for switches on the
APU fire panel. Switches differ in number
and placement of wires and jumpers.
GO TO NEXT PAGE
M04-2935-2