TM 1-1520-238-MTF
2-13
PROCEDURE
TROUBLESHOOTING
REFERENCE
BEFORE STARTING APU PILOT/CPG (CONT)
b. CSC panel Verify proper system
function at all stations.
*3. Caution/warning panels Check proper
indications, test and reset.
*4. Fire detectors Test.
*5. Instrument TEST panels Test
function, digits control, and photocell
dimming. Check SDD function in all
positions.
STARTING ENGINES EXTERNAL
PRESSURIZED AIR SOURCE
Refer to Chapter 4, paragraph A.
**STARTING APU PILOT
1. Fire guard Posted if available. APU
exhaust area clear.
2. Hydraulic accumulator Verify 2600 psi
minimum.
*3. APU START.
A9
A12
A8
A15