TM 11520238T1
Change 5
4121
418 GEN INTERACTIVE FD/LS CHECK (cont)
418
TASK
RESULT
g. On ELEC PWR
panel, release
GEN1/OFF/RESET/
TEST switch, and
set and hold GEN
2/OFF/RESET/TEST
switch to TEST.
Generator 2 is continually
tested for test power for 30
seconds.
If one or more FD/LS
NOGO displays listed
appear on the HOD, perform
the following in sequence.
(1) Perform SYSTEMS
POWER DOWN
(para 32) and APU
shutdown (para 33).
(2) Perform CORRECTIVE
ACTION indicated for first
NOGO displayed on
HOD.
(3) Perform SYSTEMS
POWERUP
(para 31).
(4) On DEK, rotate DATA
ENTRY switch to STBY
for 5 seconds, then back
to FD/LS (ADC).
(5) Repeat FD/LS check
beginning with step b. If
NOGO repeats after
CORRECTIVE ACTION,
refer to
TM 1-1520-238-T-6.
When the advisory message
GENERATOR SYSTEMS
GO appears on HOD, go to
next step.
h. Release the GEN 2
/OFF/RESET/TEST
switch.
NOTE
Record all NOGOs before rotating DATA
ENTRY switch to STBY (ADC).
i. On DEK, rotate
DATA ENTRY switch
to STBY (ADC).
