TM 11520238T1
4122
Change 5
418 GEN INTERACTIVE FD/LS CHECK (cont)
418
TASK
RESULT
NOTE
If this FD/LS check is to be followed by a AC
ELECTRICAL POWER GENERATION
OPERATIONAL CHECK (TM 1-1520-238-T-6),
omit step 3.
3. Perform SYSTEMS POWER DOWN (para 32) and
APU shut down (para 33) if power no longer required.
FD/LS NOGO
DISPLAY
CORRECTIVE ACTION
GENERATOR 1
NOGO LH XMSN BAY
Troubleshoot wiring to isolate
fault (TM 1-1520-238-T-6). If
troubleshooting does not
remove NOGO, replace
generator 1
(TM 1-1520-238-23).
GENERATOR 2
NOGO RH XMSN
BAY
Troubleshoot wiring to isolate
fault (TM 1-1520-238-T-6). If
troubleshooting does not
remove NOGO, replace
generator 2
(TM 1-1520-238-23).
GENERATOR 1
CONTROL NOGO
POWER CENTER
Troubleshoot wiring to isolate
fault (TM 1-1520-238-T-6). If
troubleshooting does not
remove NOGO, replace
generator 1
(TM 1-1520-238-23).
GENERATOR 2
CONTROL NOGO
POWER CENTER
Troubleshoot wiring to isolate
fault (TM 1-1520-238-T-6) .If
troubleshooting does not
remove NOGO, replace
generator 2
(TM 1-1520-238-23).
END OF TASK
