TM 1-1520-238-23
Change 8
1-332.3/(1-332.4 blank)
1.110A. TAIL ROTOR BALANCE AVA KIT INSTALLATION continued
e. Attach optical sensor cable to DAU receptacle
labled TACHO 2 (10).
f. Route and clamp accelerometer cable (16)
down right side of vertical stabilizer and tail-
boom with optical sensor cable (17) forward
to DAU in CPG station.
g. Attach accelerometer cable to DAU receptacle
labeled ACC 4 (18).
h. Remove maintenance platform.
i. Perform AVA tail rotor balance maintenance
operational check (TM 1-1520-238-T).
END OF TASK
ACC1
ACC 3
TACHO
1
ACC2
ACC 4
TACHO
2
DATA
10
M04-5210-5
M04-5210-9
17
16
ACC 2
ACC 4
TACHO
2
18
M04-5210-10
All data on page 1-332.4 including Paragraph 1.111 deleted