TM 1-1520-238-23
2-114
Change 3
2.40.
CANOPY JETTISON ACCESS DOOR SEAL REPLACEMENT
This task covers:
Removal. Cleaning. Inspection. Repair. Installation.
2.40.1. Initial Setup
Tools:
Aircraft mechanics tool kit (item 376, App H)
Airframe repairmans tool kit (item 377, App H)
Light duty laboratory apron (item 27, App H)
Chemical protective gloves (item 154, App H)
Adjustable air filtering respirator (item 262, App H)
2-inch wide hand roller (item 270, App H)
Materials/Parts:
Seal (table D-84, App D)
Brush (item 34, App F)
Cloth (item 52, App F)
Estane cement (item 79, App F)
Estane cement accelerator (item 80, App F)
Methyl ethyl ketone (item 124, App F)
Methyl isobutyl ketone (item 125, App F)
Naphtha (item 127, App F)
Personnel Required:
67R
Attack Helicopter Repairer
68G
Aircraft Structural Repairer
67R3F
Attack Helicopter Repairer/Technical
Inspector
References:
TM 1-1500-204-23
Equipment Conditions:
Ref
Condition
1.57
Helicopter safed
2.40.2. Removal
a. Remove canopy jettison access door (1) from
airframe (2).
(1) Release thumb latch (3) on door (1).
(2) Remove straight pin (4) from hinge halves (5)
(TM 1-1500-204-23).
(3) Remove door (1).
GO TO NEXT PAGE
M04-4533-1
M04-4533-2
1
4
3
2
5
