TM 1-1520-238-23
3-68
Change 8
3.18.
MAIN LANDING GEAR SHOCK STRUT REMOVAL/INSTALLATION continued
j. Install outboard washer (6) on mount shaft (7).
k. Lubricate mount shaft and threads (7). Use
antiseize compound (item 26, App F).
l. Install nut (5) on mount shaft (7). Torque nut (5)
208 to 333 FOOT-POUNDS.
(1) Torque nut (5) to 208 FOOT-POUNDS. Use
torque wrench and socket.
(2) Increase torque to aline cotter pin holes, but
do not exceed 333 FOOT-POUNDS.
(3) Install new retaining ring (ADM) or cotter pin
(ADL) (ADN) (8) through nut (5) and mount
shaft (7).
m. Install jumper (9) on shock strut (1).
(1) Place jumper (9) with bracket (11) under
clamp (10).
(2) Install clamp (10) on strut (1).
(3) Perform electrical bond check on jumper (9)
(TM 55-1500-323-24).
(a) Bond shall be 1.0 OHM or less. Use
multimeter.
(4) Seal jumper bonding area. Use sealing
compound (item 174, App F).
n. Inspect (QA).
o. Remove axle jack (para 1.67).
p. Service shock strut (para 1.40 and 1.41).
q. Remove tripod jacks (para 1.66).
r. Secure access doors L135 and/or R135;
install fairings L140 and/or R140 (para 2.2).
END OF TASK
M04-053-16B
7
6
8
5
ADN
ADM
7
6
8
5
ADL
M04-053-17B
12
11
9
10
1
ADM
ADL
ADN