TM 1-1520-238-23
4-490
4.149.
NO. 1 OR NO. 2 ENGINE LOAD DEMAND SPINDLE FORWARD CABLE REMOVAL continued
4.149.3. Removal
a. Enter pilot station (para 1.56). Observe all
safety precautions.
b. Set collective stick (1) to full up.
(1) Rotate friction lock (2) counterclockwise to
lock.
c. Remove external power hydraulic (primary)
(para 1.72).
d. On No. 1 engine, remove engine load demand
spindle forward cable (3) from aft cable (4).
(1) Hold cable (3) at flats (5). Remove coupling
nut (6).
(2) Remove fitting (7) from fitting (8).
e. On No. 2 engine, remove engine load demand
spindle aft cable (9) from forward cable (10).
(1) Hold cable (9) at flats (11). Remove coupling
nut (12).
(2) Remove fitting (13) from fitting (14).
f. On No. 2 engine, remove cable (10) from sup-
port bracket (15).
(1) Hold cable (10) at flats (16). Remove nut (17)
from cable (10).
(2) Remove cable (10) from bracket (15).
(3) Remove nut (18) from cable (10).
GO TO NEXT PAGE
M04-1187-21
1
2
NO. 1 ENGINE LDS CABLE
3
5
6
7
84
M04-1187-2
M04-1187-11
NO. 2 ENGINE LDS CABLE
10
14
13
1211
9
M04-1187-12
17
NO. 2 ENGINE LDS CABLE
18
10
16
15