TM 1-1520-238-23
4-523
4.157.
ENGINE LOAD DEMAND SPINDLE CABLE SUPPORT REMOVAL/INSTALLATION continued
e. Install rod end (15) on cable (9). Torque nut (19)
to 20 INCH-POUNDS.
(1) Install nut (19) on cable (9) so 0.5 INCH of
threaded cable is exposed.
(2) Install rod end (15) 0.5 INCH on cable (9).
Aline as shown.
(3) Hold cable flats (18). Torque nut (19) to 20
INCH-POUNDS. Use torque wrench.
f. Install rod end (8) on cable (1). Torque nut (17)
to 20 INCH-POUNDS.
(1) Install nut (17) on cable (1) so 0.5 INCH of
threaded cable is exposed.
(2) Install rod end (8) 0.5 INCH on cable (1).
Aline as shown.
(3) Hold cable flats (16). Torque nut (17) to 20
INCH-POUNDS. Use torque wrench.
g. Install cable (9) on bellcrank (2). Torque nut
(12) 14 to 18 INCH-POUNDS.
(1) Aline rod end (15) in bellcrank (2).
(2) Install bolt (11) through bellcrank (2) and rod
end (15).
(3) Install nut (12) on bolt (11).
(4) Hold bolt (11). Torque nut (12) to 14 INCH-
POUNDS. Use torque wrench.
(5) Increase torque to aline cotter pin hole, but do
not exceed 18 INCH-POUNDS.
(6) Install new cotter pin (10).
GO TO NEXT PAGE
9
18
15
19
M04-2319-17
1/2 IN
1
16
8
17
M04-2319-18
1/2 IN
2
M04-2319-19
11
15
12
10
9
