TM 1-1520-238-23
4-519
4.157.
ENGINE LOAD DEMAND SPINDLE CABLE SUPPORT REMOVAL/INSTALLATION continued
4.157.3. Removal
a. Remove No. 1 engine load demand spindle
(LDS) forward cable (1) from bellcrank (2).
(1) Remove and discard cotter pin (3).
(2) Hold bolt (4). Remove nut (5).
(3) Remove bolt (4) from bellcrank (2) and rod
end (8).
b. Remove No. 2 engine LDS forward cable (9)
from bellcrank (2).
(1) Remove and discard cotter pin (10).
(2) Hold bolt (11). Remove nut (12).
(3) Remove bolt (11) from bellcrank (2) and rod
end (15).
c. Remove rod end (8) from cable (1).
(1) Hold cable flats (16). Loosen nut (17).
(2) Remove rod end (8) and nut (17) from cable
(1).
d. Remove rod end (15) from cable (9).
(1) Hold cable flats (18). Loosen nut (19).
(2) Remove rod end (15) and nut (19) from cable
(9).
GO TO NEXT PAGE
2
M04-2319-3
3
4
5
8
1
12
2
M04-2319-4
11
9
15
10
16
1
17
8
M04-2319-10
18
9
19
15
M04-2319-5