TM 1-1520-238-23
Change 1
4-529
4.159.
NO. 1 ENGINE POWER AVAILABLE SPINDLE CABLE INSTALLATION (PILOT TO
CPG) continued
4.159.3. Installation
a. Check cable ribbon (1) friction load.
(1) Place cable (2) on flat surface. Ensure cable
(2) is not bent or twisted.
(2) Slide ribbon (1) 2.5 INCHES in and out of
cable (2). There should be no binding, stiff-
ness, or jamming.
(3) Check friction load of ribbon (1). Load not to
exceed 1.5 POUNDS. Use scale.
(4) If ribbon movement is rough or friction load
exceeds 1.5 POUNDS, replace cable.
b. Enter CPG station (para 1.56). Observe all
safety precautions.
CAUTION
To prevent damage to cable, avoid sharp
bends which could result in kinking of
cable.
c. Route cable (2) through pilot floor (3).
(1) Install cable (2) through pilot floor (3).
(2) Position grommet (4) around cable (2) in pilot
floor (3).
d. Route cable (2) through seal (5).
e. Route cable (2) through bracket (6).
(1) Install nut (7) and spacer (8) on cable (2).
(2) Route cable (2) through bearing (9).
(3) Install spacer (10) and nut (11) on cable (2).
GO TO NEXT PAGE
2
M04-1192-2
1
M04-1192-15
2
4
3
5
M04-1192-6A
11
10
9
7
6
8
2