TM 1-1520-238-23
4-530
Change 1
4.159.
NO. 1 ENGINE POWER AVAILABLE SPINDLE CABLE INSTALLATION (PILOT TO
CPG) continued
f. Install nut (13) rod end (12) on cable (2).
Torque nut (13) to 20 INCH-POUNDS.
(1) Install nut (13) on cable (2).
(2) Install rod end (12) on cable (2) to depth of
0.50 INCH.
(3) Hold rod end (12). Torque nut (13) to 20
INCH-POUNDS. Use torque wrench.
g. Install rod end (12) on CPG No. 1 power lever
(14). Torque nut (15) 14 to 18 INCH-POUNDS.
(1) Install bolt (16) through power lever (14) and
rod end (12).
(2) Install nut (15) on bolt (16).
(3) Hold bolt (16). Torque nut (15) to 14 INCH-
POUNDS. Use torque wrench.
(4) Increase torque to aline cotter pin hole, but do
not exceed 18 INCH-POUNDS.
(5) Install new cotter pin (17).
h. Adjust cable (2) travel to obtain 5.90 INCHES
of travel. Torque nuts (7) and (11) to 90 INCH-
POUNDS.
(1) Set CPG No. 1 power lever (18) to IDLE.
(2) Measure cable travel from center of bolt (16)
to shoulder (19) of cable (2).
(3) Adjust nuts (7) and (11) to obtain 5.90 INCH-
ES of travel.
(4) Torque nuts (7) and (11) to 90 INCH-
POUNDS. Use torque wrench.
GO TO NEXT PAGE
M04-1192-7
2
13
14
17
15
16
12
M04-1192-8A
18
7
11
2
19
16
