TM 1-1520-238-23
Change 1
4-531
4.159.
NO. 1 ENGINE POWER AVAILABLE SPINDLE CABLE INSTALLATION (PILOT TO
CPG) continued
i. Tighten clamp (20) on seal (5) and cable (2).
j. Enter pilot station (para 1.56). Observe all
safety precautions.
k. Install cable (2) on bracket (21).
(1) Route cable (2) through bracket (21) and re-
tainer (22).
(2) Aline retainer (22) with two holes in bracket
(21).
(3) Install two bolts (23) and washers (24)
through retainer (22) in bracket (21).
l. Install nut (26) and rod end (25) on cable (2).
Torque nut (26) to 20 INCH-POUNDS.
(1) Install nut (26) on cable (2).
(2) Install rod end (25) on cable (2) to a depth of
0.50 INCH.
(3) Aline rod end (25) with bellcrank (27).
(4) Hold rod end (25). Torque nut (26) to 20
INCH-POUNDS. Use torque wrench.
m. Install rod end (25) on bellcrank (27). Torque
nut (28) 14 to 18 INCH-POUNDS.
(1) Set pilot No. 1 power lever (29) to IDLE.
(2) Install bolt (30) through bellcrank (27) and rod
end (25).
(3) Hold bolt (30). Install nut (28).
(4) Torque nut (28) to 14 INCH-POUNDS. Use
torque wrench.
(5) Increase torque to aline cotter pin hole, but do
not exceed 18 INCH-POUNDS.
(6) Install new cotter pin (31).
GO TO NEXT PAGE
5
M04-1192-16
20
2
2
21
22
24
23
M04-1192-10
30
25
26
2
31
28
M04-1192-11
27
29