TM 1-1520-238-23
4-553
4.164.
NO. 1 OR NO. 2 POWER AVAILABLE SPINDLE CABLE CONNECTING LINKS
REMOVAL/INSTALLATION continued
c. Install rod end (1) on No. 1 power lever (2).
Torque nut (5) 14 to 18 INCH-POUNDS.
(1) Position power lever (2) to LOCKOUT.
(2) Install bolt (4) through power lever (2) and rod
end (1).
(3) Install nut (5) on bolt (4).
(4) Hold bolt (4). Torque nut (5) to 14 INCH-
POUNDS. Use torque wrench.
(5) Increase torque to aline cotter pin hole, but do
not exceed 18 INCH-POUNDS.
(6) Install new cotter pin (3).
d. Install rod end (6) on No. 2 power lever (7).
Torque nut (10) 14 to 18 INCH-POUNDS.
(1) Install bolt (9) through power lever (7) and rod
end (6).
(2) Install nut (10) on bolt (9).
(3) Hold bolt (9). Torque nut (10) to 14 INCH-
POUNDS. Use torque wrench.
(4) Increase torque to aline cotter pin hole, but do
not exceed 18 INCH-POUNDS.
(5) Install new cotter pin (8).
e. Inspect (QA).
f. Perform No. 1 engine power available spindle
rigging procedure (para 4.182) or No. 2 engine
power available spindle rigging procedure
(para 4.183).
g. Install console panels PL1 and PL3 (para 2.2).
END OF TASK
4
5
M04-3929-9
2
1
3
9
10
M04-3929-8
7
6
8
