TM 1-1520-238-23
4-551
4.164.
NO. 1 OR NO. 2 POWER AVAILABLE SPINDLE CABLE CONNECTING LINKS
REMOVAL/INSTALLATION continued
b. Remove rod end (6) from No. 2 power lever (7).
(1) Remove and discard cotter pin (8).
(2) Hold bolt (9). Remove nut (10).
(3) Remove bolt (9) from power lever (7) and rod
end (6).
c. Remove No. 2 rod end (11) from bellcrank (12).
(1) Remove and discard cotter pin (13).
(2) Hold bolt (14). Remove nut (15).
(3) Remove bolt (14) from bellcrank (12) and rod
(11).
d. Remove No. 1 rod end (16) from bellcrank (17).
(1) Remove and discard cotter pin (18).
(2) Hold bolt (19). Remove nut (20).
(3) Remove bolt (19) from bellcrank (17) and rod
(16).
4.164.4. Cleaning
a. Clean removed and attaching parts (para
1.47).
4.164.5. Inspection
a. Check connecting links for cracks. None al-
lowed.
b. Check connecting links for corrosion (para
1.49).
GO TO NEXT PAGE
M04-3929-3
7
6
9
10
8
15
M04-3929-4
14
12
11
13
20
M04-3929-5
17
16
19
18